fbpx

DAM HALF MARATHON & DAM RELAY COURSES

The Half Marathon course starts in the scenic town of South Prairie (elevation 467′) and finishes with the Marathon, across the Historic McMillin Bridge (elevation 128′). The Half Marathon has a net elevation loss of 339 feet.

RACE STATS:

Fall Race Date: October 3, 2021
Spring Race Date: May 1, 2022 — Coming Soon
Start Time:
7:30 a.m.
Location:
South Prairie, Washington
Course: Mud Mountain Dam Half Marathon (←Map My Run)
Elevation Loss: 339′

The half marathon begins alongside Veteran’s Park and the South Prairie Creek, gradually taking you downhill on the Foothill Rail Trail. You’ll pass through farmlands and forest, snaking along the Carbon River.

As you continue down the Foothill Trail, you’ll make your way through the quaint towns and communities of the Cascade Junction, South Prairie, and Orting. The finish takes you across the McMillin Foothill’s Trail Bridge before running through the Historic McMillin Bridge to cross the finish line.

GET READY TO RUN IN…

RELAY STATS:

Fall Race Date: October 3, 2021
Spring Race Date: May 1, 2022 — Coming Soon
Location:
Enumclaw, Washington / South Prairie, Washington
Course: Marathon Course
Elevation Loss: 1,191′ Total

Leg 1 – 13.1 Miles

The first leg of the relay starts at Mud Mountain Dam Park (elevation 1,319′) with the Marathon, kicking off with a 7 mile rolling downhill heading towards the SR 410 White River crossing. After a short tour of the neighborhoods in the City of Buckley, the course connects to the fast gradual downhill of the Foothill Rail Trail (elevation 467′), where you’ll send off your second runner.

Leg 2 – 13.1 Miles

The second leg of the relay starts in the scenic town of South Prairie (elevation 467′) alongside Veteran’s Park and the South Prairie Creek. Continuing down the Foothill Rail Trail, you’ll pass through farmlands and forest, snaking along the Carbon River through the quaint towns of the Cascade Junction, South Prairie, and Orting. The finish takes you across the McMilin Foothill’s Trail Bridge before running through the Historic McMillin Bridge to cross the finish line (elevation 128′).

default
default
DSC_1136
DSC_1136
IMG_4895
IMG_4895
IMG_6914
IMG_6914
default
default
IMG_9362
IMG_9362
default
default
IMG_4898
IMG_4898
previous arrow
next arrow